Agree the acceptance checks before a garden network cable is installed. It is much easier to resolve an unsuitable route or missing label while it is still visible than after the garden has been reinstated.

Stage one: before work starts

Write down the two endpoints, intended link speed, cable specification, agreed route and responsibility for electrical protection or building entries. Ask whether the job includes basic verification, performance qualification or standards certification. Those are different services.

Record a baseline at the main building: a local network test if available and an internet test on a known device. This helps avoid blaming the garden cable for a satellite or Wi-Fi problem that was already present.

Stage two: before concealment

Ask the installer to demonstrate that the installed product matches the quote. Obtain route photographs and measurements to fixed landmarks. Check labels, entry protection, connector protection and any agreed spare route provision. Do not enter an excavation or handle unfinished electrical equipment to inspect it yourself.

Request the agreed cable tests at the appropriate installation stage. Fluke Networks explains that a wire-map check establishes basic connection information but does not prove bandwidth performance. A row of continuity lights is not a Cat 6 certification report.

Stage three: after termination

Have the installer record link negotiation at both ends and complete the specified qualification or certification tests. Save the actual report with the cable identifier, date and test limit. Check a local transfer across the link before testing an internet download.

Then test the far building's real use: video call, access point, printer or camera as applicable. A laptop plugged into the endpoint helps separate the cable from Wi-Fi coverage.

Handover sheet

Keep the route plan, cable code, endpoint labels, test report, equipment list and installer contact together. Record unresolved defects and the agreed remedy before sign-off. Recheck operation after the first significant weather event and report water ingress or intermittent faults promptly.

The bridge video illustrates an alternative link technology, not a method for certifying buried copper.

Related question

What should I test before my Starlink installer leaves?

Sources and further reading

Topic inspiration: Farm. This is an independently written Starlink Tips guide, not a reproduction or a claim of hands-on testing. Official instructions for your exact equipment take priority.

Thumbnail: original AI-generated conceptual illustration; not a fitting, wiring or measurement diagram. Reviewed 1 November 2026.